Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Users running a report can be given the option to download the report to

...

PDF and CSV. These are individual options when configuring the report template.

...

Download CSV

Reports If the report has been enabled for download to CSV it can be downloaded using the export as CSV file button found at the top of each the report page. It is not possible to download a multi report to CSV at this time.

...

Generation of the CSV will begin once this button is clicked and progress is represented by a percentage estimation. You are free to navigate away and continue working during this process, it is not necessary to remain on the page for the duration of the generation.

...

Once the CSV has been successfully generated the button will change to download CSV file. This link will remain active for 7 days from the time of generation and will expire after this time. The CSV file can be re-generated at any time by clicking the refresh button. The date and time of last generation is shown for reference of when the data was last refreshed.

...

Download PDF

If the report has been enabled for download to PDF is an additional option for download when viewing a this option is available at the top of the report. This includes viewing a report directly from the reports list and additionally when viewing a report which is embedded within an event.

...